Oracle Golden Gate, Veridata and Enterprise Manager upgrade

Project goals:

  • Upgrade Oracle Golden Gate, Oracle Golden Gate Veridata, Oracle Enterprise Manager Cloud Control to the latest versions

Accomplishments:

  • Oracle Golden Gate upgraded from version 12.2.0.1 to 19.1.0.0.4
  • Oracle Enterprise Manager Cloud Control upgraded from version 13.2 to 13.4
  • Oracle Golden Gate Veridata from version 12.2.1.2 to version 12.2.1.4

Technologies:

  • Oracle Golden Gate
  • Oracle Golden Gate Veridata
  • Oracle Enterprise Manager Cloud Control 13c
  • Oracle Database
  • Oracle Linux

Workload:

  • 325 hours

Project team:

  • 2 x Senior Oracle DBA
  • Senior Oracle Database Architect
  • Project Manager

 

Database data processing and space usage optimization

Project goals:

  • Remediate space shortage for a 120+ TB database
  • Optimize data processing in the database, tune the system performance
  • Develop DB backup solution

Accomplishments:

  • The database size has been reduced by 60% by reclaiming unusable space
  • The data processing approach has been changed, implementing External Tables, to avoid unnecessary DB operations. This allowed to speed up data ingestion processes by 40%
  • A logical backup solution has been developed to suit the company’s target KPIs

Technologies:

  • Oracle Database
  • Oracle Linux
  • Oracle PL/SQL

Workload:

  • 50 hours

Project team:

  • Senior Oracle DBA

 

Business Continuity solution design and implementation

Project goals:

  • Remediate a malfunctioning backup solution
  • Design a zero-downtime availability solution for an Oracle Exadata-based system

Accomplishments:

  • The existing backup solution has been reconfigured, decreasing backups footprint by 50%, while maintaining the required redundancy KPIs
  • A flexible business continuity solution has been developed, including several standardized service levels (Platinum, Gold, Silver) for different business applications
  • Sub-second RPO and sub-minute RTO has been achieved for Platinum service level, even for the most devastating failure scenarios

Technologies:

  • Oracle Database
  • Oracle Exadata
  • Oracle Zero Data Loss Recovery Appliance
  • Oracle Enterprise Manager Cloud Control
  • Oracle Grid Infrastructure
  • Oracle Real Application Clusters

Workload:

  • 120 hours

Project team:

  • Senior Oracle Exadata Administrator
  • Senior Oracle Database Architect
  • Senior Business Analyst

 

Highly-available Retail OLTP Database migration and High Availability solution design

Project goals:

  • Migrate of 50+ TB Highly-Available OLTP database from Europe to Russia
  • Migrate the DB from IBM Power AIX-based servers to Oracle Exadata X7
  • Setup a high-availability solution, based on geo-replication between Russian and European datacenters
  • Ensure the migration downtime window to be less than 4 hours
  • Migrate Weblogic-based enterprise application

Accomplishments:

  • Highly-available, scalable architecture has been developed, comprising Oracle RAC, geo-distributed DataGuard system, Cascade Active DataGuard for offloading reporting workload
  • A custom two-phase migration approach has been developed to ensure downtime windows of less than 4 hours
  • The migration solution based on XTTS for Phase One and on Data Guard switch-over for phase 2
  • The migration procedure has been scripted to minimize the downtime and manual work
  • The load testing plan has been developed, using Oracle Database Replay
  • The solution has been implemented within 4 months, meeting the deadline requirements

Technologies:

  • Oracle Database
  • Oracle Exadata
  • Oracle Cross-Platform Transportable Tablespaces (XTTS)
  • Oracle Enterprise Manager Cloud Control
  • Oracle Grid Infrastructure
  • Oracle Real Application Clusters
  • Oracle DataGuard
  • Weblogic Server
  • Oracle Database Replay
  • AIX
  • Oracle Enterprise Linux

Workload:

  • 945 hours

Project team:

  • 2 x Senior Oracle Exadata Administrator
  • 2 x Senior Oracle Middleware Administrator
  • Senior Oracle Database Architect
  • Project Manager

Oracle DB migration to Exadata and Oracle Enterprise Manager Cloud Control implementation

Project goals:

  • Migrate Oracle Database from Red Hat Linux to Oracle Exadata X7
  • Implement Oracle Enterprise Manager Cloud Control 13c
  • Develop custom system reports for OEM
  • Perform system patching to the latest technology levels

Accomplishments:

  • Enterprise data warehouse has been migrated to Exadata, drastically increasing the system’s scalability and resilience
  • A robust monitoring solution has been configured through OEM to facilitate 24×7 support
  • Both DB and OEM has been patched to the latest code levels
  • 18 custom OEM reports developed for compliance, audit, and operational purposes

Technologies:

  • Oracle Database
  • Oracle Exadata
  • Oracle Enterprise Manager Cloud Control
  • Weblogic Server
  • RedHat Enterprise Linux

Workload:

  • 200 hours

Project team:

  • 2 x Senior Oracle DBA

 

Massive Oracle DB system migration and Disaster Recovery solution implementation

Project goals:

  • Migrate 200+ enterprise databases from a variety of platforms (AIX, HP-UX, Linux), consolidating them on Oracle Exadata X7
  • Upgrade legacy DB versions in the process of migration, from versions 9i, 10g, 11g to 12c
  • Set up Disaster Recovery solution
  • Conduct performance optimization as per Exadata best practices

Accomplishments:

  • We have developed a flexible migration plan to be able to adjust the migration approach for each DB’s specific requirements
  • Migration approaches list included Oracle DataGuard switchover, Oracle Data Pump migration and Oracle RMAN duplicate
  • The migration process have been scripted to minimize downtime and optimize work
  • All database have been migrated to Exadata servers
  • Disaster recovery solution has been designed and set up, comprising Oracle RAC, Oracle Data Guard with standby databases on a dedicated Exadata system, and Oracle RMAN backups

Technologies:

  • Oracle Database 9i, 10g, 11g, 12c
  • Oracle Exadata X7
  • Oracle Grid Infrastructure
  • Oracle Real Application Clusters
  • Oracle DataGuard
  • Oracle RMAN
  • Oracle Data Pump
  • HP-UX
  • AIX
  • RedHat Enterprise Linux

Workload:

  • 15.000 hours

Migration team:

  • 3 x Senior Oracle Exadata Administrator
  • Senior Oracle Database Architect
  • Project Manager

Support team — 24×7 coverage:

  • Rotation shift member: 8 x Senior Oracle DBA
  • Rotation team leader: 4 x Senior Oracle Exadata Administrator